28,500 m² internal + 15,000 m² external
Published CLF case study: seamless warehouse floor for Capital Properties at Long Lakes / Linbro Park, using laser screed placement and steel fibres.
CLF publishes long-form project case studies with floor size, equipment, floor type and project context. This concept brings those records forward as proof.
Published CLF case study: seamless warehouse floor for Capital Properties at Long Lakes / Linbro Park, using laser screed placement and steel fibres.
Published case study: traditional jointed concrete-floor overlay placed over an existing floor using laser screed equipment and dry-shake hardener.
Published CLF project record describing FM2 floor tolerance with a traditional saw-cut layout.
CLF published project coverage describes a laser-screed warehouse floor plus 12,200 m² of external concrete hardstands.
A 2026 CLF project page documents grinding, primer, epoxy screed coats, sealer and surface hardener on its workshop floor.
The wider current CLF site publishes additional project and technical content across industrial-floor construction, repair and maintenance.
Instead of a gallery with ten anonymous warehouse photos, each case study can show the floor system, size, specification, equipment, operational challenge and outcome.